So you want to build a house in Massachusetts.
The following are the final permissions I need prior to living at the house:
1. Electrical
2. Plumbing
3. Highway department (paved driveway apron and connection to town road)
4. Board of health (potable water, proper septic)
5. Mass Department of Environmental Protection (geothermal system, acquifer protection)
6. Fire department (smoke & CO alarms)
7. Building department (general code for house, etc.)
Mrs. Hamm told me that when she and her husband built her house, they could live there while still building. Now, I need someone to tell me my stove is safe before I can live in my own home. Go figure.
4 Comments:
Repeat after me: Missouri
Ay-ay-ay....
Oh, and PS the Chambers is not safe. We have had to switch it out. Pah.
So much, I had never thought you would need soooo much permission!
Post a Comment
Subscribe to Post Comments [Atom]
<< Home